Behind-The-Meter Solutions
Speed-to-Power, Secured.
Scale your energy infrastructure without the procurement risk. POWREX provides exclusive access to remanufactured, heavy-duty turbines backed by strict escrow controls and transparent logistics. Real assets. Real timelines. Verified execution.
In short, we source and deliver heavy-duty gas turbines and generators for behind-the-meter data center power.

Behind-the-Meter (BTM) Gas Turbine Power for Data Centers
POWREX orchestrates the full behind-the-meter (BTM) gas turbine procurement lifecycle for hyper-scale data centers and critical infrastructure: removing friction between decommissioned heavy-duty gas turbine assets and your site’s operational readiness.
Institutional Sourcing & Extraction
We secure verified decommissioned gas turbines and generators directly from top-tier operators—bypassing the gray market of “ghost equipment” and unverified brokers.
Phase 01
Zero-Hour Certification (Remanufacturing + Testing)
Assets undergo zero-hour remanufacturing, certification, and testing to meet data center uptime requirements and N+1 redundancy mandates.
Phase 02
De-risked Transactions (Escrow-Secured Procurement)
Capital is protected through escrow-secured turbine transactions and strict, transparent controls—ensuring financial security until the asset is verified, cleared, and ready for deployment.
Phase 03
Turnkey Global Transit & Heavy-Lift Logistics
From the decommissioning site to your data center footprint, we manage heavy-lift turbine logistics, packaging, export/import coordination, and global transport-direct to your site.
• Sourcing: Direct access to tier-one decommissioned gas turbine assets
• Certification:Zero-hour remanufactured gas turbines for continuous uptime
• Security:Escrow-secured procurement to protect your capital
• Logistics: Global heavy-lift turbine transport delivered to your site
Phase 04
Flexible Deployment: Bridge to Baseload.
Data center power constraints require dynamic solutions. We match the exact hardware class to your specific megawatt deficit and timeline.
Bridge Power
Rapid-deployment aeroderivative turbines to get your facility online so you don't have to wait out the multi-year utility grid queue.


Permanent Baseload
Heavy-frame, continuous-cycle turbines for total grid independence and dedicated, long-term power generation for AI data centers and other power-hungry facilities.
FAQs
Let's get some of your biggest questions answered.
How do you guarantee the turbines aren't "ghost assets"?
We do not broker unverified equipment. Every asset is physically audited, and clear ownership title is established before it enters our off-market pipeline.
How do you protect multi-million dollar procurement capital?
Through strict, attorney-backed escrow controls. Capital sits securely and is only released upon the completion of hard, verifiable extraction and transit milestones.
What is the timeline for deployment?
By utilizing off-market, Zero-Hour remanufactured units, we completely bypass the standard 2-to-3-year OEM manufacturing backlogs. We manage the end-to-end heavy-haul logistics to deliver rapid bridge or baseload power directly to your site.
What is the typical timeline from sourcing to deployment?
While timelines vary based on heavy-haul logistics and unit scale, our focus on off-market and Zero-Hour remanufactured units allows hyperscale developers to completely bypass the standard 2-to-3-year OEM manufacturing backlogs. We specialize in rapid-deployment assets that can bridge the gap or provide permanent baseload power in a fraction of the traditional timeline.