Behind-The-Meter Solutions
Speed-to-Power, Secured.
Scale your energy infrastructure without the procurement risk. POWREX provides exclusive access to remanufactured, heavy-duty turbines backed by strict escrow controls and transparent logistics. Real assets. Real timelines. Verified execution.
In short, we source and deliver heavy-duty gas turbines and generators for behind-the-meter data center power.

Behind-the-Meter (BTM) Gas Turbine Power for Data Centers
POWREX orchestrates the full behind-the-meter (BTM) gas turbine procurement lifecycle for hyper-scale data centers and critical infrastructure: removing friction between decommissioned heavy-duty gas turbine assets and your site’s operational readiness.
Institutional Sourcing & Extraction
We secure verified decommissioned gas turbines and generators directly from top-tier operators—bypassing the gray market of “ghost equipment” and unverified brokers.
Phase 01
Zero-Hour Certification (Remanufacturing + Testing)
Assets undergo zero-hour remanufacturing, certification, and testing to meet data center uptime requirements and N+1 redundancy mandates.
Phase 02
De-risked Transactions (Escrow-Secured Procurement)
Capital is protected through escrow-secured turbine transactions and strict, transparent controls—ensuring financial security until the asset is verified, cleared, and ready for deployment.
Phase 03
Turnkey Global Transit & Heavy-Lift Logistics
From the decommissioning site to your data center footprint, we manage heavy-lift turbine logistics, packaging, export/import coordination, and global transport-direct to your site.
• Sourcing: Direct access to tier-one decommissioned gas turbine assets
• Certification:Zero-hour remanufactured gas turbines for continuous uptime
• Security:Escrow-secured procurement to protect your capital
• Logistics: Global heavy-lift turbine transport delivered to your site
Phase 04
Flexible Deployment: Bridge to Baseload.
Data center power constraints require dynamic solutions. We match the exact hardware class to your specific megawatt deficit and timeline.
Bridge Power
Rapid-deployment aeroderivative turbines to get your facility online so you don't have to wait out the multi-year utility grid queue.


Permanent Baseload
Heavy-frame, continuous-cycle turbines for total grid independence and dedicated, long-term power generation for AI data centers and other power-hungry facilities.